Free shipping on orders over $75 · Shop the coastal collection

Harlequin CAP9 Sewage Treatment Plant ---600 to 699 Litres Installation Instructions

SKU: 757048247

4.0
USD1740.00 USD1775.00

Pay in 4 interest-free payments of $435.00 Learn more

Shipping Estimate
USA
  • USA
  • CAN

Ships within 48 hours · Estimated delivery Jul 25 - Jul 30

Description

Installation Instructions

2 x 2'' Brass Tank Connector (supplied loose) - upgrade to 3" available

Tank Dimensions:Length: 2400mmWidth: 1300mmHeight: 1300mmWeight: 340kg

Length: 590mm

This tank can also be used as a generator feed tank

Harlequin CAP9 Sewage Treatment Plant ---600 to 699 Litres Installation InstructionsHarlequin CAP9: High Performance 9 Person Sewage Treatment Plant This 9 person sewage treatment plant is ideal for smaller homes (up to 7 bedrooms) and domestic settings. Designed to effectively manage the wastewater needs of a typical family, the CAP9 system is an efficient, environmentally friendly solution for sewage treatment. CAP Installation Guide CAP9 Specification Sheet CAP9 Drawing Manufactured from durable Medium Density Polyethylene (MDPE)

Exchange/Return Notes
  • We offer a 30-day return/exchange service after receiving.
  • Final sale items are not eligible for returns or exchanges.
  • To process your return/exchange, please contact us at [email protected]
  • Please click here for more details>>> Return & Exchange Policy

You may also like

recommand products